SourcingAI

Meter transformer

I have found results from200000+products and70000+suppliers aboutMeter transformer

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Current Transformer
Type: Voltage Transformer
Type: Combined Transformer
Application: Electronic
Phase: Three
Operation Condition: Indoor
Usage: Protection
Multilayer Honeycomb Type
Insulating Medium: Epoxy Resin
Installation: Strut Type
Single Stage Type
Voltage Transformation Principle: Electromagnetic Type
Output Signal Type: Digital Output
Production Process: Injection
Material: Metal
Accuracy Grade: 0.1G
IP Rating: IP20
Certification: CCC
Customized: Customized
Display: Digital
Theory: Electric Apparatus
AC and DC
DC Voltmeter Type: Electrostatic
AC Voltmeter Type: Electromagnetic
Application: Instrument
Application: Position Sensor
Application: Audio
Application: Lighting
Switching Power Supply
Phase: Single
Operation Condition: Outdoor
Usage: Measurement
Meter for Industry and Home Use
Standard Electric Energy Meter
Multi-Functional Energy Meter
Maximum Demand Meter
Multi-rate Watt-hour Meters
Usage: Watt-Hour Meter
Reactive Energy Meter
Usage: Prepayment Meter
Single Layer & Tightly Wound Type
Small Fixed Type
Common Insulating Materials
Insulating Medium: Insulating Oil
Insulating Medium: Insulating Paper
Installation: Penetration Type
Installation: Busbar Type
Installation: Active Type
Installation: Direct Connected
Installation: Extension Type
Magnetic Circuit Structure: Combined Type
Voltage Transformation Principle: Capacitive Type
Voltage Transformation Principle: Photoelectric Type

Sourcing guidance for Meter Transformer

What are the key technical specifications to consider when selecting a Meter Transformer?

When sourcing meter transformers (Current Transformers or Potential Transformers), you must prioritize Accuracy Class (e.g., 0.2s, 0.5s) to ensure precise billing and monitoring. Key electrical parameters include the Rated Transformation Ratio, Rated Burden (VA), and Insulation Level (kV). For industrial applications, ensure the core material is made of high-permeability silicon steel or nanocrystalline to minimize phase shift and ratio errors.

Which international compliance standards are mandatory for Meter Transformers?

To ensure global market access and safety, products must adhere to IEC 61869 (the international standard for instrument transformers). For specific regions, look for CE marking (Europe), ANSI/IEEE C57.13 (North America), or UL certification. If the transformer is used for fiscal billing, it must meet MID (Measuring Instruments Directive) or local utility-grade metrology requirements.

How do I choose between Split-Core and Solid-Core Meter Transformers?

Split-Core transformers are ideal for retrofitting existing systems as they can be installed without disconnecting primary cables, significantly reducing labor costs. Solid-Core transformers are preferred for new installations due to their higher accuracy, better environmental sealing, and generally lower unit price. Your choice should depend on whether the project is a brownfield upgrade or a greenfield development.

What environmental factors affect the performance of Meter Transformers?

Operating temperature and humidity are critical. Ensure the unit has an IP65 or higher rating if used outdoors. For high-altitude installations, verify the dielectric strength and clearance distances are adjusted for lower air density. Additionally, check the thermal stability to ensure the transformer can handle short-circuit currents without permanent damage to the insulation.

Cross-Border Procurement Risks and Strategies for Meter Transformers

How can I mitigate the risk of receiving substandard electrical components?

Always request a Type Test Report from an independent third-party laboratory (such as KEMA or TUV). Before shipping, arrange for a Pre-Shipment Inspection (PSI) to verify the winding resistance, polarity, and insulation resistance. Using a reputable platform like Made-in-China.com allows you to filter for 'Audited Suppliers' who have undergone rigorous on-site factory verifications.

What are the best practices for negotiating with Meter Transformer manufacturers?

Focus on the Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for extended warranties (typically 2-5 years) and request customized labeling (OEM) for your brand. For bulk orders, aim for a 15-20% discount by committing to an annual volume, and ensure the Incoterms (e.g., FOB or CIF) are clearly defined to avoid hidden logistics surcharges.

How should Meter Transformers be packaged for international sea freight?

Transformers are heavy and sensitive to moisture. Insist on vacuum-sealed plastic wrapping and the use of desiccants inside the packaging. Products should be secured in fumigated wooden crates with internal shock-absorbing materials to prevent core displacement or casing cracks during transit. Ensure the outer crates are marked with 'Fragile' and 'Keep Dry' symbols.

What transaction security measures should be taken for high-value electrical orders?

Utilize Secured Payment services provided by Made-in-China.com to ensure funds are only released after you confirm receipt and inspection of the goods. For large-scale industrial contracts, consider using a Letter of Credit (L/C) to protect both parties against non-performance and financial volatility.

Related queries