House
I have found results from300000+products and100000+suppliers aboutHouse
20FT 40FT Tiny Expandable Container Capsule Prefabricated House with Bathroom & Kitchen, High Wind Resistance Performance
Myanmar Earthquake Rebuilds Refugee Portable Prefab Container House Expandable Prefabricated Modular Tiny House
Capsule Steel Structure Prefabricated Modular Apple Prefab Tiny House for Campsite Stay
40FT Luxury 3 Bedroom Prefabricated Modular House Expandable Container Home
Customized 20FT 30FT 40FT Portable Mobile Modern Folding Expandable Container House
Nature Resort Prefabricated Steel Construction Apple Cabin Family Container House
20/40FT Luxury Modern 3 Bedroom Waterproof Foldable Expandable Prefab Portable Modular Container House
Flat Pack Container House Prefabricated Modular Portable Accommodation Building
Prefab Long-Lasting Luxury Weatherproof Apple Cabin Tiny House for Holiday Lodging
OEM Site-Specific Water-Resistant Low-Maintenance Fast-Build Container House for Commercial Site Office Projects
Cheap Prefab Popular 40FT Apple Cabin House Quick Build Portable Office Container House
Prefab House Modular Foldable Container Houses Portable Home Camps Dormitories Apartments
Ibeehive Wholesale Custom Portable coffee Bar Living House Prefabricated Container House
40FT Steel Prefab Container House 3 Bedroom Family Villa with Wraparound Porch
China Factory Price 40FT Easy Install Foldable Ready Made Big Size Folding Modular Prefab Prefabricated Container House
Mobile Home Prefab Homes Tiny Home Ready Container House for Camps
Affordable Prefabricated Container House: 40FT Expandable Prefab Container House for Families
Luxury 20FT Tiny Prefabricated Modular Cabin House Portable Home for Hotel Apartment
Luxury Low Cost Prefabricated 20/40 FT Modular Tiny Mobile Home Prefab Detachable Container House for Living
Complete Expandable Container Prefabricated House with Kitchen New Design Prefab Living Mobile Modular House
Sourcing guidance for House
How to choose the right structural material for a prefabricated house?
Selecting the structural core is the most critical decision for longevity. Light Gauge Steel (LGS) is the industry standard for its high strength-to-weight ratio, termite resistance, and fire safety. For temporary or budget-sensitive projects, K-type or T-type prefabricated houses using galvanized steel frames and sandwich panels are more economical. Ensure the steel is hot-dip galvanized with a coating thickness of at least 275g/m² to prevent corrosion in humid or coastal environments.
What insulation and wall panel specifications are necessary for different climates?
The wall panel choice directly impacts energy efficiency. For cold climates, prioritize Polyurethane (PU) or Rock Wool sandwich panels with a thickness of 75mm to 100mm due to their superior thermal R-values. For tropical regions, EPS (Expanded Polystyrene) is a cost-effective option, but it must be fire-retardant grade (B1 level). Always verify the density of the core material; for Rock Wool, a density of 100kg/m³ or higher is recommended for better sound insulation and structural rigidity.
Which international building codes and compliance standards should be verified?
B2B buyers must ensure the supplier can manufacture according to local regulations. Common standards include ISO 9001 for quality management, CE marking for the European market, and AS/NZS standards for Australia/New Zealand. Specifically, check for wind load ratings (e.g., resistance to 120km/h+ winds) and seismic resistance (typically Grade 7-9). Request SGS or Intertek test reports for the fire rating of internal materials to ensure they meet local safety codes.
How to evaluate the interior finishing and technical integration?
A high-quality prefab house should come with pre-installed electrical and plumbing systems that match the destination country's standards (e.g., UL for USA, SAA for Australia). Ensure the flooring is SPC or PVC waterproof flooring for durability. For 'Expandable Container Houses,' check the hydraulic or manual hinge mechanisms for smoothness and air-tightness. Ask if the supplier provides BIM or CAD drawings to facilitate local foundation preparation and assembly.
Cross-Border Procurement & Risk Management for Prefabricated Houses
What are the primary logistics risks when shipping modular houses?
The biggest risk is damage during sea freight and high shipping costs. To mitigate this, use SOC (Shipper Owned Container) options or ensure the house is designed for Flat-pack loading (4-units per 40HQ container) to maximize space. Ensure the supplier uses heavy-duty protective film and steel corner protectors during packing. It is highly recommended to purchase All-Risk Marine Insurance covering 110% of the CIF value.
How can buyers ensure transaction security and quality control from a distance?
For high-value assets like houses, never release the full payment upfront. Use a 30% deposit and 70% balance payment against the Bill of Lading (B/L) or via Letter of Credit (L/C). Utilize Made-in-China.com's Secured Trading services to protect your funds. Additionally, hire a third-party inspection agency (like V-Trust or QIMA) to conduct a During Production Inspection (DPI) and a Pre-Shipment Inspection (PSI) to verify dimensions, material thickness, and waterproof testing.
What strategies should be used when negotiating with Chinese prefab house suppliers?
Focus on the 'Total Landed Cost' rather than just the unit price. Negotiate for spare parts (extra bolts, sealant, touch-up paint) to be included at no cost, as these are hard to source locally. Ask for a volume discount if ordering more than 5 units, and request a detailed installation manual or video guide as part of the contract. Professional suppliers on Made-in-China.com may also offer on-site engineer supervision for large-scale projects, which is a valuable negotiation point.
What are the precautions regarding local customs and assembly?
Before the ship arrives, confirm the HS Code (typically 940690) with your local customs broker to determine import duties. Be aware that some countries require Anti-Dumping Duty checks on steel structures. Ensure the supplier provides a Packing List that matches every numbered component of the house; without this, local assembly will be delayed, leading to high demurrage charges at the port.





























