SourcingAI

Synchronous condenser suppliers

I have found results from2000+products and700+suppliers aboutSynchronous condenser suppliers

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: ZSN
Type: Asynchronous Motor
Application: Industrial
Speed: Constant Speed
Function: Driving
Casing Protection: Closed Type
Direct on-line Starting
Certification: ISO9001
Number of Stator: Three-Phase
Number of Poles: 4
Air Tube Material: Galvanized Sheet
Corrosion Durability: Higher
Operating Voltage: 230 VAC
Noise Level: Low
Application Fields: Mechanical Engineering
Mounting: Floor Standing
Lifetime: 15~20 years
Condition: New
Operating Speed: High Speed
Excitation Mode: Compound
Structure and Working Principle: Brush
Weight: 3t
Nominal Voltage: 768V
Nominal Capacity: 215kWh
Low Frequency Coupling
Generator Type: Synchronous Generator
AC Three Phase
Standard: Standard
Power Source: AC Motor
Structure: Electromagnetic
Mixing Heat Exchanger
Material: Stainless Steel
Parts: Evaporator
Cooling Method: Air-cooled
Unit Structure: Integral
Selected Voltage: 380V/50HZ
Compressor Number: 2
Application: Universal
Application: Household Appliances
Application: Car
Application: Power Tools
Application: Commercial
Application: General Purpose
Application: Power
Application: High Voltage
Application: Cooler
Speed: High Speed
Function: Control
Casing Protection: Protection Type
Certification: CCC
Certification: RoHS
Certification: UR
Certification: ISO
Certification: CE
Certification: TLC
Number of Poles: 12
Application Fields: Plastic
Operating Speed: Constant Speed
High Frequency Coupling
Usage: Filter
Low Frequency Bypass
High Frequency Bypass
Home Refrigerator & Freezer
Standard: Nonstandard

Sourcing guidance for Synchronous Condenser Suppliers

What are the key technical specifications to evaluate when selecting a synchronous condenser supplier?

Buyers should prioritize Reactive Power Capacity (MVAR), ensuring the unit meets both leading and lagging requirements. Key technical benchmarks include High Inertia Constants for grid stability, Short-Circuit Ratio (SCR) levels, and Hydrogen or Air Cooling Systems depending on the capacity. Ensure the supplier provides Brushless Excitation Systems to reduce maintenance overhead and Digital Control Systems (DCS) compatibility for remote grid monitoring.

Which international compliance standards are mandatory for synchronous condensers in cross-border trade?

Suppliers must adhere to IEC 60034 series (Rotating electrical machines) or IEEE C50.13 standards. For the European market, CE Marking and Grid Code Compliance (GCC) are essential. Ensure the manufacturer holds ISO 9001 (Quality Management) and ISO 14001 (Environmental Management) certifications to guarantee industrial-grade reliability and sustainable production practices.

How can a buyer verify the operational reliability and lifespan of the equipment?

Request Type Test Reports from independent laboratories covering Temperature Rise Tests, Overload Capability, and Vibration Analysis. A high-quality synchronous condenser should have a design life of 25-30 years. Ask for Insulation Class F or H verification and evidence of Vacuum Pressure Impregnation (VPI) technology used in stator winding to prevent moisture and mechanical stress.

What role does the 'Flywheel' play in modern synchronous condenser procurement?

For grids with high renewable energy penetration, buyers should specify the need for an Integrated Flywheel. This increases the Rotational Inertia, providing critical frequency support during grid disturbances. Verify if the supplier can customize the Moment of Inertia to match specific regional utility requirements.

Cross-Border Procurement & Risk Management for Heavy Electrical Machinery

What are the primary risks when importing heavy power equipment like synchronous condensers?

The main risks include Logistical Damage due to the unit's extreme weight and Technical Non-compliance with local grid codes. To mitigate this, use Professional Third-Party Inspection (e.g., SGS or Intertek) during the FAT (Factory Acceptance Test) and ensure the contract includes Marine Cargo Insurance with specific clauses for heavy-lift machinery.

How should buyers negotiate payment and warranty terms with international suppliers?

Adopt a Milestone-Based Payment structure: 30% deposit, 40% after successful FAT, 20% upon arrival, and 10% Retention Money held until the end of the commissioning period. Demand a Performance Bond and a minimum 24-month warranty that covers both parts and technical on-site supervision for repairs.

What are the shipping and installation precautions for large-scale condensers?

Due to the size, these units require Breakbulk Shipping or Flat Rack Containers. Ensure the supplier provides a Detailed Foundation Design and Installation Manual at least 3 months before delivery. It is highly recommended to source from suppliers on Made-in-China.com who offer On-site Commissioning Support and have experience with DDP or CIF terms to handle complex customs clearances for oversized energy equipment.

How to ensure transaction security in high-value B2B energy projects?

Utilize Escrow Services or Letters of Credit (L/C at sight) to protect capital. Before finalizing, conduct a Factory Audit via video or a local agent to verify the supplier's heavy-duty manufacturing facilities and their history of successful International Grid Projects.

Related queries