SourcingAI

Carbon steel pipe manufacturers

I have found results from20000+products and8000+suppliers aboutCarbon steel pipe

Hot Sell Seamless Carbon Steel Pipe

Hot Sell Seamless Carbon Steel Pipe

US$520.00
5 Tons(MOQ)
Black or Galvanized Steel Carbon Welded Steel Pipe

Black or Galvanized Steel Carbon Welded Steel Pipe

US$520.00
5 Tons(MOQ)
Carbon Steel Pipe /Seamless Steel Pipe Galvanized Pipe

Carbon Steel Pipe /Seamless Steel Pipe Galvanized Pipe

US$520.00
5 Tons(MOQ)
Black Square Hollow Section Carbon Steel Pipe, Galvanized Steel Pipe

Black Square Hollow Section Carbon Steel Pipe, Galvanized Steel Pipe

US$520.00
5 Tons(MOQ)
Carbon/Stainless Seamless Steel Pipe for Oil and Gas

Carbon/Stainless Seamless Steel Pipe for Oil and Gas

US$520.00
5 Tons(MOQ)
Carbon/Seamless Steel Pipe for Oil and Gas/Steel Pipe

Carbon/Seamless Steel Pipe for Oil and Gas/Steel Pipe

US$520.00
5 Tons(MOQ)
Hot Sale ASTM Round 20# Seamless Steel Tube Carbon Steel Pipe

Hot Sale ASTM Round 20# Seamless Steel Tube Carbon Steel Pipe

US$600.00
1 Ton(MOQ)
Carbon Steel Pipe with Stock Delivery for Pipeline Works and Structure Works

Carbon Steel Pipe with Stock Delivery for Pipeline Works and Structure Works

US$520.00
5 Tons(MOQ)
Carbon Steel Pipe Stock Delivery for Pipeline Works and Structure Works

Carbon Steel Pipe Stock Delivery for Pipeline Works and Structure Works

US$640.00
10 Tons(MOQ)
Carbon Steel Pipe

Carbon Steel Pipe

US$560.00
5 Tons(MOQ)
Top Quality ASTM Carbon Steel Pipe Hot Rolled Seamless Steel Pipe

Top Quality ASTM Carbon Steel Pipe Hot Rolled Seamless Steel Pipe

US$640.00
10 Tons(MOQ)
Hollow Section Square/Rectangular/Round Carbon Steel Pipe

Hollow Section Square/Rectangular/Round Carbon Steel Pipe

US$640.00
10 Tons(MOQ)
Hollow Section Rectangular and Square Black Carbon Steel Pipe

Hollow Section Rectangular and Square Black Carbon Steel Pipe

US$640.00
10 Tons(MOQ)
Seamless/Welded Carbon Steel Tube/Pipe for Mechanical/Structural Using/Water Pipe/Building Material/Steel Material

Seamless/Welded Carbon Steel Tube/Pipe for Mechanical/Structural Using/Water Pipe/Building Material/Steel Material

US$640.00
10 Tons(MOQ)
Building Material Carbon Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe

Building Material Carbon Steel Pipe Hollow Section Galvanized/Welded/Black/Seamless/Stainless Round Tube/Pipe

US$640.00
10 Tons(MOQ)
Hot Dipped Galvanized Steel Pipe Carbon, Black Steel Pipe

Hot Dipped Galvanized Steel Pipe Carbon, Black Steel Pipe

US$640.00
10 Tons(MOQ)
Prime Carbon Steel Galvanized Round Diameter Iron Tube / Seamless Pipe

Prime Carbon Steel Galvanized Round Diameter Iron Tube / Seamless Pipe

US$640.00
10 Tons(MOQ)
Carbon Steel Pipe Galvanized Pipe Used in Construction

Carbon Steel Pipe Galvanized Pipe Used in Construction

US$600.00
5 Tons(MOQ)
Carbon Steel Pipe ASTM A53 A106 with Stock Delivery for Pipeline Works

Carbon Steel Pipe ASTM A53 A106 with Stock Delivery for Pipeline Works

US$640.00
10 Yards(MOQ)
Worth Buying 20# Hot Rolled AISI Steel Tube Seamless Steel Carbon Pipe

Worth Buying 20# Hot Rolled AISI Steel Tube Seamless Steel Carbon Pipe

US$600.00
1 Ton(MOQ)
Liaocheng Mingxing Pipe Manufacturing Co., Ltd.mic-icon
Satisfies 2/2 of your requirements
ASTM A53 Grade B Carbon Steel Pipe 1/2 Inch to 24 Inch ERW Straight Welded Pipe SSAW Spiral Welded Pipe for Water Gas Oil Transportation Construction Project

ASTM A53 Grade B Carbon Steel Pipe 1/2 Inch to 24 Inch ERW Straight Welded Pipe SSAW Spiral Welded Pipe for Water Gas Oil Transportation Construction Project

US$510.00-530.00
5 Tons(MOQ)
Sample Available
Oil and Gas Pipeline Pipe Factory Supply 5L ASTM A106 A53 Grade B Sch40 Hot Rolled/Cold Rolled Carbon/Mild Steel Ms Iron Black Welded Seamless Tube

Oil and Gas Pipeline Pipe Factory Supply 5L ASTM A106 A53 Grade B Sch40 Hot Rolled/Cold Rolled Carbon/Mild Steel Ms Iron Black Welded Seamless Tube

US$460.00-510.00
5 Tons(MOQ)
Sample Available
Customizable Thick-Walled 15-325mm Od 4-13m Length GB/ASTM/En Carbon Steel Pipe for Mining & Drilling Operations

Customizable Thick-Walled 15-325mm Od 4-13m Length GB/ASTM/En Carbon Steel Pipe for Mining & Drilling Operations

US$500.00-540.00
5 Tons(MOQ)
Sample Available
Versatile Carbon Steel Seamless Pipe with Od 3/4 Inch Sch 80 for ASTM A106 Gr. B in Chemical Plants

Versatile Carbon Steel Seamless Pipe with Od 3/4 Inch Sch 80 for ASTM A106 Gr. B in Chemical Plants

US$470.00-530.00
5 Tons(MOQ)
Sample Available
Seamless Durable Q235 Premium Seamless Carbon Steel Round Pipe for Oil and Gas Od 1/2"-24", Wt Sch10-160, API Certified, for Oil/Gas, Boiler and Structural Use.

Seamless Durable Q235 Premium Seamless Carbon Steel Round Pipe for Oil and Gas Od 1/2"-24", Wt Sch10-160, API Certified, for Oil/Gas, Boiler and Structural Use.

US$500.00-540.00
5 Tons(MOQ)
Sample Available
High Tensile Seamless Boiler Pipe Conforming to ASTM A106 Standard Carbon Steel Pipe for Industrial Boiler Heat Transmission and Equipment Pipeline Construction

High Tensile Seamless Boiler Pipe Conforming to ASTM A106 Standard Carbon Steel Pipe for Industrial Boiler Heat Transmission and Equipment Pipeline Construction

US$545.00-585.00
5 Tons(MOQ)
Sample Available
Seamless Carbon Steel Pipe ASTM A106 Gr. B GB/T 8163 Od 6-200mm Sch 40-160 for Power Plant Steam Lines High-Temp Boiler Tubes

Seamless Carbon Steel Pipe ASTM A106 Gr. B GB/T 8163 Od 6-200mm Sch 40-160 for Power Plant Steam Lines High-Temp Boiler Tubes

US$520.00-580.00
5 Tons(MOQ)
Sample Available
16 mm ID, 4.5 mm 5.5 mm 6.35 mm, in Stock, Od High-Precision Seamless Steel Barrel Pipe, 60 Cmsch 40 60 80 Carbon Steel Pipeline Casing for Oil & Gas Precision

16 mm ID, 4.5 mm 5.5 mm 6.35 mm, in Stock, Od High-Precision Seamless Steel Barrel Pipe, 60 Cmsch 40 60 80 Carbon Steel Pipeline Casing for Oil & Gas Precision

US$545.00-585.00
5 Tons(MOQ)
Sample Available
ASTM Corten ERW Welded Steel Pipe Q235 Q355 Structural Carbon Steel Tube Sch40 Sch80 6'' 8'' 12'' Building Construction Material

ASTM Corten ERW Welded Steel Pipe Q235 Q355 Structural Carbon Steel Tube Sch40 Sch80 6'' 8'' 12'' Building Construction Material

US$499.00-550.00
5 Tons(MOQ)
Sample Available
Manufacturer Custom Carbon Steel Seamless Tube Certified Pipe Bend Forming Parts Drill Oil Application Structure Pipe GS

Manufacturer Custom Carbon Steel Seamless Tube Certified Pipe Bend Forming Parts Drill Oil Application Structure Pipe GS

US$545.00-585.00
5 Tons(MOQ)
Sample Available
Low-Temperature Resistant Seamless 1/2"-18" GB/ASTM/En Carbon Steel Pipe for Cryogenic Storage Tank Piping

Low-Temperature Resistant Seamless 1/2"-18" GB/ASTM/En Carbon Steel Pipe for Cryogenic Storage Tank Piping

US$500.00-540.00
5 Tons(MOQ)
Sample Available
ASTM Standard A53 Ms Carbon 3m 6m 9m 12m Length Round Hot Rolled Seamless Steel Pipe

ASTM Standard A53 Ms Carbon 3m 6m 9m 12m Length Round Hot Rolled Seamless Steel Pipe

US$525.00-545.00
5 Tons(MOQ)
Sample Available
Carbon Steel Pipe Premium ASTM A106/A53 5L Gr. B Hot Finished Seamless Steel Pipe 20#/45#/10#/35#/ Q345b/Q345D/Q345e/20cr/40cr Seamless Steel Pipe

Carbon Steel Pipe Premium ASTM A106/A53 5L Gr. B Hot Finished Seamless Steel Pipe 20#/45#/10#/35#/ Q345b/Q345D/Q345e/20cr/40cr Seamless Steel Pipe

US$499.00-530.00
1 Ton(MOQ)
Sample Available
Large Quantities Available for Immediate Delivery ASTM A106 20# Custom Carbon Steel Seamless Pipe for Engineering and Boilers

Large Quantities Available for Immediate Delivery ASTM A106 20# Custom Carbon Steel Seamless Pipe for Engineering and Boilers

US$525.00-545.00
5 Tons(MOQ)
Sample Available
Shandong Xinshenhao Intelligent Equipment Co., Ltd.mic-icon
Satisfies 2/2 of your requirements

Sourcing guidance for Carbon Steel Pipe

What are the key technical standards and grades to consider when sourcing carbon steel pipes?

Buyers must prioritize compliance with international standards such as ASTM A106 (Grade B) for high-temperature service, ASTM A53 for general mechanical and pressure applications, and API 5L for oil and gas pipelines. For structural use, ASTM A500 is the industry benchmark. Ensure the supplier provides a Mill Test Certificate (MTC) according to EN 10204 3.1, which verifies the chemical composition (Carbon, Manganese, Silicon) and mechanical properties (Tensile strength, Yield strength, Elongation).

How do manufacturing processes affect the performance and cost of carbon steel pipes?

There are two primary types: Seamless (SMLS) and Welded (ERW/LSAW/SSAW). Seamless pipes are manufactured without a weld seam, making them suitable for high-pressure environments and critical applications, though they carry a higher price point. Welded pipes (ERW) are more cost-effective and suitable for low-to-medium pressure applications like water or structural support. For large diameters, LSAW (Longitudinal Submerged Arc Welding) is preferred for its structural integrity.

What surface treatments and coatings are necessary for corrosion protection?

Carbon steel is highly susceptible to rust. Depending on the usage scenario, you should specify treatments such as Black Painting (Varnish) for temporary protection, Hot-Dip Galvanizing (HDG) for long-term atmospheric corrosion resistance, or 3PE (Three-Layer Polyethylene) coating for underground pipelines. For internal protection, Epoxy Lining is often required to prevent fluid contamination and internal scaling.

What dimensional tolerances and inspection methods should be verified before shipment?

Strict adherence to Outer Diameter (OD) and Wall Thickness (WT) tolerances is crucial for installation. Standard tolerances usually fall within +/- 1% for OD and -12.5% for WT. Buyers should request Non-Destructive Testing (NDT), such as Ultrasonic Testing (UT), Hydrostatic Testing, and X-ray inspection for welded seams to ensure there are no internal defects or leaks.

Cross-Border Procurement Risks and Strategic Advice

How can I mitigate the risk of receiving sub-standard steel quality?

Always conduct a Third-Party Inspection (TPI) through agencies like SGS, BV, or Intertek before the final payment. These inspectors verify the quantity, dimensions, and material grade at the factory. Additionally, sourcing from Audited Suppliers on Made-in-China.com ensures the manufacturer has undergone rigorous on-site verification of their production capabilities and quality management systems.

What are the best practices for negotiating price and payment terms in the steel industry?

Steel prices fluctuate daily based on raw material costs. It is advisable to lock in a price with a formal Proforma Invoice (PI) that has a short validity period (e.g., 3-7 days). For payment, use Letter of Credit (L/C at sight) for large volumes to ensure security, or Telegraphic Transfer (T/T) with a 30% deposit and the 70% balance paid against the Bill of Lading (B/L) copy.

What logistics and packaging precautions are needed for international shipping?

Steel pipes are heavy and prone to damage. Ensure pipes are bundled with steel strips and that small diameters are packed in hexagonal bundles. For sea freight, request end protectors (plastic caps) to prevent thread damage and internal debris. To avoid 'white rust' on galvanized pipes during transit, ensure the containers are dry and consider seaworthy packaging with waterproof wrapping.

How do international trade policies and anti-dumping duties affect carbon steel pipe imports?

Steel is a sensitive commodity. Before ordering, check your country's Harmonized System (HS) Code (typically starting with 7304 or 7305) for Anti-Dumping Duties (ADD) or Countervailing Duties (CVD) specifically targeting Chinese steel. Consult with a local customs broker to confirm the Total Landed Cost, including any protective tariffs or Section 232 duties (in the U.S. market).

Related queries